Each process defines certain deliverables known as the________
- Work Products
- Programs
- Documents
- All of These
- N/A
Show Answer
Answer: D Explanation: -
Function Points proposoded and developed by
- Allan Albrecht
- Barry Bohem
- Caper Jones
- DeMarco and Tom Gilb
- N/A
Show Answer
Answer: A Explanation: -
Following are some statements associated with data flow diagrams. Identify the correct statement from among them.
- DFDs are used to model complex interfaces.
- DFDs are used to represent only functional processing, data stores and data movements between functions.
- DFDs depict only processes which can be decomposed.
- DFDs do not show external data sources and external data sinks
- N/A
Show Answer
Answer: B Explanation: -
Given below are some statements associated with data flow diagrams. Identify the correct statement from among them.
- Data flow is made use of to model what systems do.
- Flows of data can take place from a process to a sink.
- All processes have to be levelled or decomposed.
- Context diagram shows the major system processes
- N/A
Show Answer
Answer: D Explanation: -
Quality Assurance is an activity performed throughout software production it involves
- Verification
- validation
- generalization
- Both A and B
- N/A
Show Answer
Answer: D Explanation: -
Revision, Adaptation and Operation these are the metrices for software quality identified by
- Tom Gilb
- Barry Bohem
- Caper Jones
- McCall
- N/A
Show Answer
Answer: D Explanation: -
Software crisis came in 1960 what is the main reason to for the crisis
- Software development technique
- Hardware
- Software
- None of these
- N/A
Show Answer
Answer: A Explanation: -
The scope description establishes the ----------between the system we are developing and everything else in the universe
- Boundary
- Balance
- Constraint
- None of the given
- N/A
Show Answer
Answer: A Explanation: -
Upfront Effort includes Requirements, Analysis, Design and Project Planning Spend _____% of the entire project time
- 40
- 20
- 80
- 50
- N/A
Show Answer
Answer: A Explanation: -
Which one of the following is most relevant statements regarding function point?
Function point is the measure of project effort
Function point is the measure of project schedule
Function point is the measure of project size
All of these
- N/A
Show Answer
Answer: C Explanation: